Projects 4

Home Profile Expertise Projects Clients Links 

 

Projects 1 Projects 2 Projects 3 Projects 4 Projects 5 Projects 6

Oscar Faber, Facilities Management Surveys

To carryout comprehensive building surveys of existing building services found within properties own by the Crown Prosecution Service, HSBC Bank, Leicester College, to name but a few. Works involved assessing the extent and condition of existing services, evaluating future modifications and advising of  future cost implications in relation to maintaining their properties.


20Kw Wind Turbine, Nottinghamshire (Gazelle WT's)

Works involved assessing the clients property for suitability for the installation of a wind turbine allowing for locating the controls & power supplies. Establishing the incorporation of the system into the existing services and installing the electrical & control requirements of turbine.  Due to the nature of the power produced by the turbine it was also necessary to modify the end users electrical demand philosophy to ensure that the power produced by the turbine was used effectively. This meant instigating a regime for operating the existing demand requirements during period of high productivity & minimising consumption when the turbine is not in operation. Consideration was also given to incorporating an automated system  for this purpose to reduce the necessity for manual input.     

Nynex Cinema, Manchester (Parkinson Engineering)

To assist Parkinson Engineering with a large scale, fast track construction project we provided our client with a professional team of approved electricians and supervisors. Our operatives acted under direct instruction from the client with technical assistance from our engineers & supervisors. We also undertook the responsibility for material procurement projection to enable a fluent progression of the onsite installations.

Warehouse Extension, Swadlincote (Colombier Wines)

To provide and install a complete design and build package to cover all aspects of the construction of a warehouse extension. The finished space is to be used to store delicate fine wines & spirits and as such requires close control of the internal environmental conditions. This project was carried out using a new construction process called 'Quick wall', by Roger Bullivants Ltd. It was the 1st project undertaken using this new system and allowed the building to be weather tight within  7 days.
 

 

Send mail to Headoffice@mplprojects.co.uk with questions or comments about this web site.
Copyright 2001 MPL Construction Ltimited
Last modified: 19/08/01