Transco Pumping Station, Lichfield (Boulting Group PLC)

Our role was to provided skilled operatives to carryout the construction of the electrical & instrumentation systems associated with the installation of a new gas pumping turbine. This involved resourcing All aspects of the onsite requirements from site supervisors & clerk through to store man & labourers. Our company assisted in the initial site establishment, coordinating labour requirements, organisation of material procurement & production of task schedule for each operative. We also acted as liaison between our client, Transo & the main contractor on programming & co-ordination matters.   

Gym Refurbishment, Branston Golf & CC, Burton Upon Trent (Burton Inns)

The existing gymnasium was deemed in need of modernisation and new facilities were being included. As such we were asked to evaluate the existing M&E services and to provide for a complete overhaul of the space. An interior designer was employed and a full scheme was design covering all aspects of the development. A new A/C system was design & installed, the lighting was design to provided differing environments & the electrical powers supplies were positioned to allow optimum flexibility. Once the proposals had been finalised the onsite operation were undertaken using our team of installer, with the works being completed within a 4 week time frame. This was essential to ensure the minimum of disruption to the clubs operations. In conjunction with these works we instigated a new maintenance programme covering complete building services with the building.   

 

Send mail to Headoffice@mplprojects.co.uk with questions or comments about this web site.
Copyright 2001 MPL Construction Ltimited
Last modified: 19/08/01